Monday, October 26, 2015

Re-knitting.

I feel like I'm not making any progress on my knitting lately.  I seem to be knitting everything at least twice.  This is a sweater for my nephew.  It's going to be a Christmas gift.  I knitted almost the entire body in the car on the way to and from our vacation in August ... and I'm going to rip it all out to start over.  August was way too soon to start a Christmas gift for an infant.  This is way too small.  I'm going to start over with the next size (or maybe two sizes) up.
This is my second attempt on the second sleeve of my Lofoten sweater.  I knit the first sleeve twice, too, and then I didn't think to mark which of the two sets of increases (for the two times I knit the first sleeve) was the correct one.  So of course when I got ready to knit the second sleeve, I followed the wrong one.
This first sock picture was my second (maybe third?  I can't quite remember) attempt at stripey socks.  Then I tried it on, decided the leg was too short, and ripped it back to the top of the heel because it was also kind of gapey at the back ankle and I didn't want the leg to be half ribbed and half not.  

Here it is now.  I'm much happier with it, and hopefully on this one I can replicate it on the first try when I get to the second sock.


1 comment:

  1. Oh my goodness - I never figured out how to do anything beyond knitting long, straight items (so I got pretty good at scarves!), so I am just amazed with these pieces and astounded that they are your "mess-ups"! They look fabulous to me. =)

    ReplyDelete