I'm very happy with the result, and I hope she'll like it, too. After I finished it, I gave it a trip through the washer and dryer, and just like I've heard, washing it makes it a little crinkly and hides a multitude of quilting sins. Here's a close-up of one of the (better) stars:
Saturday, February 25, 2012
Elise's Quilt finished!
I'm very happy with the result, and I hope she'll like it, too. After I finished it, I gave it a trip through the washer and dryer, and just like I've heard, washing it makes it a little crinkly and hides a multitude of quilting sins. Here's a close-up of one of the (better) stars:
CMS/Colloquium knitting
No CMS/Colloquium next week ... It's spring break, and we'll be backpacking!
Tuesday, February 21, 2012
CMS/Colloquium knitting
Saturday, February 18, 2012
FNSI Results
I'm almost done with the quilting - this is my first free motion quilted quilt, and the first quilt I've quilted on my own machine. I'm done with the sashing and borders and half the squares, so yesterday I decided to take a break from the quilting and do binding. I attached the binding and started sewing it down on the back.
Tuesday, February 14, 2012
Two weeks of CMS/Colloquium knitting
I'm looking forward to Friday Night Sew-In this weekend. I'm working on a quilt!
Monday, February 6, 2012
Jake & Jamie's pillowcases
I cross-stitched the edge using waste canvas to see where to put the stitches. I had never used waste canvas before, but it wasn't too bad. I think it would be better suited to a smaller design, since it was kind of difficult to pull the threads out after I was done stitching. It would have been a real problem if this design didn't have so much negative space.
Wednesday, February 1, 2012
Placemat finished!
Here's a corner of the binding. I like this brown polka dot remnant, but I was surprised how much of it I used just on this one placemat (It started out at 1 1/4 yards):
Subscribe to:
Posts (Atom)